(3) The improved parts design to reduce the silt harm.Enlarges the circular diameter and the height of wicket gate in the design reduces the mean velocity of stream highly, meanwhile a tube valve was installed to reduce the water leakage to decrease abrasion in the seal area, thus reduces the abrasion of the silty water to the turbine as far as possible.
我翻译的小浪底水轮机抗冲蚀措施。Water turbine anti- abrasion technologyThe Xiaolangdi hydroelectric power station consist of 6 Francis type water-turbine generator sets, with a total installed capacity of 1800 MW. The main technical parameter for turbine are: working head 68~141m; runner diameter 6.356m, rated speed 107.1rpm, rated head 112 m and the rated capacity 306 MW。
工程造价的风险分析在国内是新课题, 引用统计概率的分析方法, 确定人,机,料的费率分布曲线, 进而确定投资的累积概率曲线, 确定投资的落入某一范围的% 概率。 这样确定的概算,不再是一个确定值, 而是一个范围, 便于工程的投资控制。而且对于不可预见费的量化有了科学的依据。 这种概算方法在国外是一种通用的方法。 其中@risk 是常用的进行风险分析的程序。希望大家讨论,再次作抛砖引玉。
对于工程中是否存在变更, 这是由合同条款确定的。对于总价合同, 由于设计较详细, 承包商通过对图纸的研究和现场踏勘, 认可了工程量清单中的工程量, 所以业主对此变更补偿的可能性很小。所以总价合同是对承包商有无经验的考验。对于单价承包的合同, 工程量清单中所列的工程量是工程投资控制的基础, 但由于勘探详细程度的限制, 工程量会与实际不符。FIDIC 和工程承包合同中都有详细的通用条款, 对于变更的成立做出了阐述。 如单项工程的工程量不超过合同工程量的10%。 当然合同专用条款会对此有所改动, 所以参阅你的合同专用条款对变更的规定。
我拼命回帖, 就是多积点分, 这儿好东西太多了。可惜错发一次帖, 另一斑竹扣我6分, 看一下图纸扣了6分。拜托斑竹送点分。 先谢了。
我觉得我们缺少的不再是设计人员, 中国有经验丰富的水工设计人员。 我认为在项目管理方面应开论坛并进行研究。多年以前, 我们引进了FIDIC 条款,引进了监理制, 我们以为跟世界接轨了。 但不知国际工程的承包惯例并不一定通行于各个国家。 目前在北美国家通行的EPCM, 即咨询工程师公司为业主提供Engineering, Procurement, Construction Management, 设计,采购,施工管理服务。可以看出, 设计与监理并没有分割。
既然有二道坝形成消力塘, 还形成这样的冲坑? 不过坝的设计够先进的, 厚高比0.17:1, 又是碾压混凝土, 第一次看见, 什么时候建的? 应该在 World Dam and Construction 上找到吧。
Obermeyer gate
我在加拿大做咱水电工程师, 去年刚监理完一个土坝,提前完工,是受到业主奖励的, 提前完工,提前收益, 业主何乐不为, 国外跟国内工作内容, 环境, 方式差不多, 但知识的补充是无尽的。 很赞同楼主的意见。
作为施工图纸,作者的设计设计很详细。 但不知技术经济上作过比较没有。 我们最近的一个可研项目也是在已建的溢流坝上加橡胶坝或Obermeyer Gate, 后者与橡胶坝的不同是气囊作为支撑, 挡水系统是前面的钢闸板。 该系统橡胶袋有压缩空气充填, 操作系统简单, 安装方便。 特别是后者, 可自由调节水位。可用于排冰,漂木。且气囊不容易损坏,安全可靠。60m * 1m 造价, 包括安装折合人民币2,400,000。公司给马来西亚设计的项目已运行。